CREW
Priya Nandal
Project Manager
Priya runs our docks and floats from the first drawing to the day the gangway goes on.
She builds each job’s schedule around the tide tables, so the barge is on site for the low water and the crew is never waiting on the sea.
Priya came to us from a Victoria general contractor, where she managed waterfront homes, and she still reads every architect’s drawing before the crew does.
FUN FACT
Priya can recite the tide for Fulford Harbour on any day this month without looking it up.
PROJECTS
Deep Cove float and gangway
Brentwood Bay community dock
Galiano Island private dock
